In continuation of orders bearing No. 11/2/70-UTFI(4)- 2016/10190 dated 09.07.2018, No. 11/2/70-UTEI (4)- 20018/ 23323 dated 20.12.2018 and No. 11/2/70- UTFI (4)- 2019 issued by the Chief Administrator, Union Territory Chandigarh and in view of the Chandigarh Building Rules (Urban) Amendment, 2018 notified vide no. 11/2/70-UTFI (4)- 2018/10157 dated 06.07.2018, I, Ajoy Kumar Sinha, IAS, Chief Administrator, Union Territory, Chandigarh, in exercise of the power conferred under Section 4 of the Capital of Punjab (Development and Regulation) Act, 1952, hereby order to extend the deadline for installation of mandatory Solar Photovoltaic Power Plant for existing residential and non-residential buildings in Chandigarh upto 31st March, 2020. This shall be treated as last extension and non further extension shall be granted beyond aforesaid date.